EASA Part-66 / Module 07
Maintenance Practices
Curriculum
Explore 141 lessons across 10 sections, from workshop safety and tool control to inspection, documentation and handover.
Module overview
All 10 sections
Select a section to see every lesson title.
01 Safety, Workshop Discipline & Tool Control 9 lessons
- 1.1Maintenance Safety Philosophy & Hazard Recognition
- 1.2Workshop Safety, Housekeeping, FOD & Environmental Control
- 1.3Electrical, Stored-Energy, Pressure & Mechanical Hazards
- 1.4Gases, Batteries, Fluids, Chemicals & Fire Hazards
- 1.5PPE, Safety Signs & Emergency Response
- 1.6Tool Control, Care, Serviceability & Calibration Status
- 1.7Workshop Consumables, Workmanship & Dimensional Discipline
- 1.8Section 1 Review — What You Learned
- 1.9Section 1 Capstone — Safe Maintenance Task Preparation
02 Tools, Measurement & Test Equipment 10 lessons
- 2.1Common Hand Tools — Selection & Correct Use
- 2.2Power Tools — Setup, Operation & Safety
- 2.3Precision Measurement — Vernier, Micrometer & Dial Instruments
- 2.4Gauges, Comparators & Inspection Measuring Equipment
- 2.5Torque Tools — Selection, Calibration & Correct Technique
- 2.6General Electrical Test Equipment
- 2.7Specialist Maintenance Test Equipment & Connection Precautions
- 2.8Tool Damage, Misuse & Measurement Errors
- 2.9Section 2 Review — What You Learned
- 2.10Section 2 Capstone — Select, Measure, Verify & Record
03 Engineering Drawings, Standards, Fits & Clearances 11 lessons
- 3.1Engineering Drawings — Views, Lines & Dimensions
- 3.2Sectional, Exploded & Assembly Drawings
- 3.3Schematics, Wiring Diagrams & Maintenance Illustrations
- 3.4Drawing Identification, Revisions & Aeronautical Standards
- 3.5ATA/iSpec Structure & Technical Information Navigation
- 3.6Limits, Tolerances, Allowances & Fits
- 3.7Clearance, Interference & Transition Fits
- 3.8Measuring Fits & Clearances in Practice
- 3.9Go/No-Go Gauges & Acceptance Decisions
- 3.10Section 3 Review — What You Learned
- 3.11Section 3 Capstone — Read, Measure & Decide
04 EWIS Practical Maintenance 18 lessons
- 4.1EWIS Fundamentals & Installation Philosophy
- 4.2Wire Types, Gauge, Identification & Selection
- 4.3Wiring Routes, Separation, Clamping & Protection
- 4.4Continuity & Resistance Testing
- 4.5Insulation Testing
- 4.6Bonding & Bonding Resistance Testing
- 4.7Crimp Tools, Terminals & Preparation
- 4.8Step-by-Step Crimping Technique
- 4.9Crimp Inspection & Joint Testing
- 4.10Connectors, Pins, Plugs & Sockets
- 4.11Contact Removal & Insertion Technique
- 4.12Coaxial Cable, Shielding & Installation Precautions
- 4.13Harness Building, Looming & Support
- 4.14EWIS Inspection — Chafing, Heat, Contamination & Damage
- 4.15EWIS Repair & Cleaning Practices
- 4.16Correct vs Incorrect EWIS Workmanship
- 4.17Section 4 Review — What You Learned
- 4.18Section 4 Capstone — Inspect, Test, Repair & Release an EWIS Task
05 Riveting, Sheet Metal, Composite & Advanced Fabrication 14 lessons
- 5.1Rivet Identification & Selection
- 5.2Rivet Layout — Pitch, Spacing & Edge Distance
- 5.3Hole Preparation, Drilling & Deburring
- 5.4Solid Riveting — Tools & Technique
- 5.5Blind/Special Riveting — Installation & Inspection
- 5.6Rivet Removal Without Structural Damage
- 5.7Acceptable vs Defective Rivets
- 5.8Sheet-Metal Cutting & Forming
- 5.9Sheet-Metal Repair Preparation
- 5.10Composite & Non-Metallic Material Handling
- 5.11Composite Damage Handling & Repair Preparation
- 5.12Additive Manufacturing — Maintenance Awareness
- 5.13Fabrication Workmanship & Final Inspection
- 5.14Section 5 Review — What You Learned
06 Mechanical Components & Installation Practices 17 lessons
- 6.1Rigid Pipes — Identification & Preparation
- 6.2Pipe Cutting, Bending & Flaring
- 6.3Flexible Hoses — Assembly, Routing & Inspection
- 6.4Unions, Fittings, Sealing & Leak Prevention
- 6.5Springs — Installation, Loading & Inspection
- 6.6Bearings — Handling & Preparation
- 6.7Bearing Installation & Removal Techniques
- 6.8Bearing Lubrication, Damage & Inspection
- 6.9Gears & Gear Trains — Installation & Inspection
- 6.10Belts, Pulleys, Chains & Sprockets
- 6.11Control-Cable Construction & Routing
- 6.12Cable Tension & Adjustment
- 6.13Turnbuckles, Terminals & Safetying
- 6.14Pulleys, Fairleads & Cable Inspection
- 6.15Mechanical Installation Errors & Defect Recognition
- 6.16Section 6 Review — What You Learned
- 6.17Section 6 Capstone — Install, Adjust & Inspect
07 Aircraft Weight, Balance, Handling & Storage 13 lessons
- 7.1Maintenance Weight & Balance Fundamentals
- 7.2Datum, Arms, Moments & Centre of Gravity
- 7.3Weighing Equipment & Aircraft Preparation
- 7.4Aircraft Levelling & Weighing Procedure
- 7.5Weight-and-Balance Calculation & Documentation
- 7.6Aircraft Jacking & Safety Precautions
- 7.7Aircraft Towing & Ground Movement
- 7.8Parking, Chocking, Mooring & Securing
- 7.9Aircraft Storage & Preservation
- 7.10Return to Service After Storage
- 7.11Ground Safety Around Engines, Propellers & Systems
- 7.12Section 7 Review — What You Learned
- 7.13Section 7 Capstone — Prepare, Weigh, Move & Secure an Aircraft
08 Disassembly, Inspection, Repair & Reassembly 19 lessons
- 8.1Maintenance Data Before Disassembly
- 8.2Task Planning & Work-Area Preparation
- 8.3Disassembly Sequence & Component Identification
- 8.4Hardware, Parts & Component Control
- 8.5Cleaning Before Inspection
- 8.6Visual Inspection Techniques
- 8.7Lighting, Mirrors, Magnification & Inspection Aids
- 8.8Crack, Wear, Corrosion & Deformation Recognition
- 8.9Dimensional Inspection & Service Limits
- 8.10NDT Awareness & Technician Responsibilities
- 8.11Repair Assessment — Repair, Replace or Refer
- 8.12Reassembly Planning & Correct Part Selection
- 8.13Consumables, Lubricants & Assembly Aids
- 8.14Torque During Reassembly
- 8.15Locking & Safetying Techniques
- 8.16Independent Inspection / Error-Capturing Principles
- 8.17Functional Checks
- 8.18Final Inspection & Configuration Verification
- 8.19Section 8 Review — What You Learned
09 Abnormal Events & Maintenance Recovery 12 lessons
- 9.1Abnormal-Event Maintenance Philosophy
- 9.2Hard/Overweight Landing Inspection Awareness
- 9.3Severe Turbulence & Excessive-Load Events
- 9.4Lightning-Strike Inspection
- 9.5Bird Strike & Foreign-Object Impact
- 9.6Ground Damage & Collision Events
- 9.7Fluid Contamination & Chemical Exposure
- 9.8Fire, Smoke & Overheat Events
- 9.9Abnormal Electrical/Battery Events
- 9.10Isolate, Inspect, Record & Escalate
- 9.11Section 9 Review — What You Learned
- 9.12Section 9 Capstone — Abnormal Event Investigation
10 Maintenance Procedures, Documentation & Communication 18 lessons
- 10.1Maintenance Data Hierarchy & Approved Instructions
- 10.2AMM — Reading and Following a Maintenance Task
- 10.3IPC, CMM, SRM & Other Maintenance Data
- 10.4Work Cards & Task Cards
- 10.5Maintenance Planning & Task Sequencing
- 10.6Modifications, Repairs & Configuration Control
- 10.7Airworthiness Directives & Mandatory Instructions
- 10.8Technical Log Entries & Maintenance Records
- 10.9Defect Recording & Rectification
- 10.10Deferred Defects & Maintenance Status Awareness
- 10.11Shift Handover & Maintenance Communication
- 10.12Writing Clear Technical Maintenance Information
- 10.13Critical Tasks & Error-Capturing Methods
- 10.14Independent Inspection Principles
- 10.15Maintenance Release & Certifying-Staff Boundaries
- 10.16Completing a Maintenance Task from Data Retrieval to Closure
- 10.17Section 10 Review — What You Learned
- 10.18Section 10 Capstone — Complete Maintenance Task & Documentation
Free short lesson / Adapted from Lesson 10.13
Critical Tasks & Error-Capturing Methods
Read the same short maintenance scenario in any of the four lesson languages.
English
A technician completes a critical installation. The work card calls for an independent inspection of the locking feature before the access panel is closed. At handover, the panel is already closed and the required inspection is still open in the record.
Keep the hold open and report the discrepancy. Consult the applicable maintenance data and the organisation’s procedure to determine how to restore access. Once the locking feature can be examined, arrange the required independent inspection. Record the result in the work package before progressing beyond the hold point.
العربية · Arabic
أكمل فنيٌّ عملية تركيب حرجة. وتنص بطاقة العمل على إجراء فحص مستقل لوسيلة التأمين قبل إغلاق لوحة الوصول. وعند تسليم المهمة، يتبين أن اللوحة أُغلقت بالفعل، في حين لا يزال الفحص المطلوب مفتوحًا في السجل.
أبقِ نقطة التوقف مفتوحة وأبلغ عن التباين. راجع بيانات الصيانة المنطبقة وإجراء المؤسسة لتحديد كيفية إعادة إتاحة الوصول. وحين يصبح فحص وسيلة التأمين ممكنًا، رتّب لإجراء الفحص المستقل المطلوب. سجّل النتيجة في ملف العمل قبل تجاوز نقطة التوقف.
اردو · Urdu
ایک ٹیکنیشن حفاظتی لحاظ سے اہم تنصیب مکمل کرتا ہے۔ ورک کارڈ کے مطابق رسائی پینل بند کرنے سے پہلے لاکنگ کے انتظام کا آزادانہ معائنہ ضروری ہے۔ کام کی حوالگی کے وقت پتا چلتا ہے کہ پینل بند ہو چکا ہے، جبکہ مطلوبہ معائنہ ریکارڈ میں اب بھی زیرِ التوا ہے۔
کام کو مقررہ مرحلے پر روکے رکھیں اور اس عدم مطابقت کی اطلاع دیں۔ دوبارہ رسائی حاصل کرنے کا طریقہ طے کرنے کے لیے قابلِ اطلاق مینٹیننس ڈیٹا اور ادارے کے طریقۂ کار سے رجوع کریں۔ جب لاکنگ کے انتظام کو دیکھا اور پرکھا جا سکے تو مطلوبہ آزادانہ معائنے کا انتظام کریں۔ مقررہ مرحلے سے آگے بڑھنے سے پہلے نتیجہ کام کے دستاویزی پیکج میں درج کریں۔
Français · French
Un technicien termine une installation critique. La fiche de travail exige une inspection indépendante du dispositif de verrouillage avant la fermeture du panneau d’accès. Lors de la relève, le panneau est déjà fermé et l’inspection requise figure toujours comme non clôturée dans le dossier.
Maintenez le point d’arrêt et signalez l’écart. Consultez les données de maintenance applicables et la procédure de l’organisme pour déterminer comment rétablir l’accès. Lorsque le dispositif de verrouillage peut être examiné, organisez l’inspection indépendante requise. Consignez le résultat dans le dossier de travail avant de franchir le point d’arrêt.
Knowledge check / English
At handover, the panel is closed and the required independent inspection is still open. What is the appropriate next step?
- Close the inspection entry based on the technician’s verbal handover.
- Keep the hold open and consult the applicable data and procedure before restoring inspection access.
- Record that the panel is closed and continue to the next task.
Show the answer
B. The closed panel does not establish that the inspection took place. Resolve the inspection requirement and document the result before progressing beyond the hold point.
Reference · EASA AMC4 145.A.48(c)(2), Independent Inspection